Thu 09 August 2007 |
Dad finished the elevator mounting - did up all the lock nuts and torque sealed. | 
|
I pottered around various stuff - installed the parking brake control cable - the last item to be installed on the panel. | 
|
The B nut on the brake valve and angle bracket mount were a pain to install with the sound proofing. | 
|
The current panel status - all coming together nicely..... | 
|
Then back to the firewall forward FAB. This is the baffle seal between the cowl and air inlet. | 
|
Getting closer but not sitting cleanly in the lip - more sanding / shaping. | 
|